Paris trip advisor 1909: Difference between revisions
Line 50: | Line 50: | ||
===Milestone 3 : Design and Data Processing (14 Nov) === | ===Milestone 3 : Design and Data Processing (14 Nov) === | ||
* Selection of features | |||
* Improvement of map | |||
* Design prototype on paper (wireframes) | |||
* Prepare midterm presentation | |||
===Milestone 4: Database implementation (28 Nov)=== | ===Milestone 4: Database implementation (28 Nov)=== |
Revision as of 13:08, 9 November 2018
The project aims to digitalize the Plan des plaisirs et attractions de Paris created by Le Nature in 1909, and to augment it with the information contained in the Guide dés plaisirs à Paris. The services that would be provided are the display of cultural places in the map that have linked pages with individualized further information, the segmentation on the map of different types of entertainment and an "exploratory mode" which would tell a narrative on a specific moment in 1909 in Paris.
Motivations
Recreating a cultural geography of Paris at the beginning of the 20th century
Ideas
- Mapping places on the map to their information on guide:
- Show pages containing the name of the place
- Adding more information about places
- Compare each attraction to the contemporary place
- Image of building in past and now
- Giving a general view about attractions in Paris in 1909:
- Show restaurants, bars, theaters in different groups to see the distribution of them.
- Show information about opening hours and prices
- Mapping narrative of guide to route on the map.
- Show routes and walking tours
Resources
Principal Resources
Additional Resources
Data extraction
Reading guide to extract engaging narratives to recommend users
Solution
Implementing a website with a database using Python, Django, and PostgreSQL to:
- Entering information about places manually to store in database
- Exploring map UI and use services
Schedule
Milestone 1: Concept (4 Nov)
- Brain storming-having sketch for ideas
- Exploring the sources and the map
- Elaboration of the overall idea
Milestone 2 : Data extraction (9 Nov)
- Scheduling and creating a draft of milestones
- Content: 1/5 of the data extracted and annotated
Milestone 3 : Design and Data Processing (14 Nov)
- Selection of features
- Improvement of map
- Design prototype on paper (wireframes)
- Prepare midterm presentation
Milestone 4: Database implementation (28 Nov)
- Develop app for entering pieces of information
- Extraction of rest of data
- Implementation of database
- Entering information to the app database
Milestone 5: Development of the platform (14 Dec)
December 14: Deadline for github repo** Design final product (main user story)
- Explore the map and places: technical
- Design entry story
technical
Milestone 6: Presentation (19 Dec)
December 19: Final project presentation
- Prepare final presentation
- Write report
Team
- Alina, Maryam, and Paola